|
|
|
|
|
|
1 |
1.1 |
|
Month 6
(Oct 2005) |
WP1 |
Conducted in conjuction with start-up workshop (see WS 11.1) |
|
|
Month 13
(16-19 May 2006), Los Baños-Philippines |
All WPL and add. tech WP staff, FB team |
Agreed on timeline and procedures for online deliverables of INCOFISH project. |
1.2 |
|
|
WP members, all WP leaders |
To review data, tools, portal and outreach |
2 |
2.1 |
WS |
Month 6
(Oct 2005) |
WP2 |
Conducted in conjuction with start-up workshop (see WS 11.1). |
|
WS |
Month 11
(3-4 Mar 2006), Estonia |
WP 2 members and additional interested parties |
Workshop in Tallinn, Estonia. Select key aquatic resources, identify potential data sources, distribute tasks to establish historical database. |
2.2 |
WS |
Month 15
(Jul 2006) |
WP members, representative of WP 1 |
Informed by data analysis, establish baselines, prepare baseline database |
3 |
3.1 |
WS |
Month 6
(Oct 2005) |
WP3 |
Conducted in conjuction with start-up workshop (see WS 11.1). |
3.1.1 |
WS |
Month 12
(Apr 2006), Campiñas, Brazil |
All WP3, some WP1 |
Review data body, perform gap analysis. Training in use of ecological modelling tools and associated hardware and software, test analysis of data, and evaluation of existing data. Assignment of further work tasks.
|
3.2 |
WS |
Month 27
(Jul 2007) |
All WP3, and other interested WPs |
Review maps, tools, and outcome of analyses; decisions on dissemination and interfaces. |
4 |
4.1 |
WS |
Month 6
(Oct 2005) |
WP4 |
Conducted in conjuction with start-up workshop (see WS 11.1) Partners learned about rational of the project, global strategies of the whole project and WP’s, first synergies were established. Partners got to know each other. |
4.1.1 |
WS |
Month 10
(Feb 2006)
London, UK
|
WP4 and WP 5 and other interested WPs |
The work plan was discussed, study cases defined, as well as criteria for models standardization and comparisons.
|
4.1.2 |
Over-seas Consul-tancy |
Months 12-14 (Apr-Jun 2006)
Shanghai, China |
WP4
and WP5 |
Overseas consultancy for construction of East China Sea ecosystem model consisting of three meetings. It includes an overseas consultancy in three major steps: Two meetings in China (hosted by ECNU) with an Ecopath model constructed as final result. The third step, a meeting in Mexico (hosted by CICIMAR) for model calibration, time simulation based on Ecosim and an introduction to Ecospace (spatial modelling). |
|
WS |
Month 17
(11-15 Sept 2006 )
Cape Town, South Africa
|
WP 4
|
Ecosim Workshop. Progress report of models construction and preliminary results on testing hypothesis. Advances on spatial modelling and definition of strategies to initiate formal interaction with WP5 on MPAs. Start service functions with other WPs.
|
4.3 |
WS |
Month 23
(Mar 2007)
La Paz, Mexico |
WP 4 |
Ecospace Workshop. Progress report on spatial models construction. Advances on MPAs approaches and testing hypotesis. |
4.4
|
WS |
Month 30
(Oct 2007) |
WP 4 |
To present Ecosystem models and prepare meta analysis |
| 5 |
5.1 |
WSSSS |
Month 6
(Oct 2005) |
WP5 |
Conducted in conjuction with start-up workshop (see WS 11.1). |
5.1.1 |
WS |
Month 10
(Feb 2006) London, UK |
WP4 and WP5 participants |
Progress report on D5.1. Study ecosystems selected, and timetable for co-ordination between WP4 and WP5 agreed. |
5.2 |
WS |
Month 23
(Mar 2007)
La Paz, Mexico |
WP5 |
Ecospace Workshop. Progress review, indentification of common themes in analyses. |
5.3 |
WS |
Month 29
(Sept 2007) |
WP5 |
Progress review, indentification of common themes in analyses. MPA conference in conjunction. |
| 6 |
6.1 |
WS |
Month 6
(Oct 2005) |
WP6 |
Conducted in conjuction with start-up workshop (see WS 11.1). |
6.1.1 |
WS |
Month 9
(Jan 2006) Aberdeen, UK |
WP6 |
Software, model and database development plan finalized. |
|
WS |
Month 13
(May 2006) Pattaya, Thailand |
WP6, WP8, WP1 |
Progress review, coastal transects software review and modify, implementation plan for next steps. |
6.2 |
WS |
Month 22
(Feb 2007) Namibia |
WP6, WP8, other related WPs |
Progress review, revision of decision framework based on the test done in Thailand, model test in Namibia, planning for next steps. |
| 7 |
7.1 |
WS |
Month 6 (Oct 2005) |
WP7 |
Conducted in conjuction with start-up workshop (see WS 11.1). |
|
WS |
Month 20
(4-7 Dec 2006) Lima-Peru |
WP 7 members and additional interested parties |
Progress review, adjustments, coordination of indicator implementation and testing. |
| 8 |
8.1 |
WS |
Month 6
(Oct 2005) |
WP8 |
Conducted in conjuction with start-up workshop (see WS 11.1). |
|
WS |
Month 13
(May 2006) Pattaya, Thailand |
WP8, WP6, some WP9 |
Present database, and report on progress with the various analyses. |
8.2 |
WS |
Month 22
(Feb 2007) Namibia |
WP 8, WP 6, other WP collaborators |
Assess findings and adjust actions. |
| 9 |
9.1 |
WS |
Month 6
(Oct 2005) |
FCD-ECOLAP
Meeting between Ecuadorian based partners in Galapagos |
Conducted in conjuction with start-up workshop (see WS 11.1).
Bibliographic review, co-organization for future Workshops in Galapagos Islands and Machalilla National Park. |
9.1.1 |
WS |
Month 12
(Apr 2006) Bogota, Colombia |
WP9 |
Drafting of 1 st deliverable with all WP9 partners. |
9.2 |
WS |
Month 21
(Jan 2007) Galapagos, Ecuador |
WP9 |
To compare results, adapt monitoring protocols and define changes of strategy.
|
9.3 |
WS |
Month 31
(Nov 2007)
Machalilla, Ecuador |
WP9 |
To discuss results and prepare final report.
|
| 10 |
|
WS |
Month 6 (Oct 2005) |
WP10 |
Conducted in conjuction with start-up workshop (see WS 11.1). |
10.1.1 |
WS |
Month 14
(Jun 2006), Bremen, Germany |
WP 10 members, subcontractors, Joe Ryan (WP 7), Nyawira Muthiga (WP 3) |
Coordination of country reports.
|
10.2 |
WS |
Month 29
(Sept 2007) |
WP10 |
To review and finalize work. |
|
11 |
11.1 |
WS |
Month 6
(5-7 Oct 2005) Kiel, Germany |
Participants of all WPs, representatives of ECOST and PASARELAS |
Start-up Workshop.
Get to know each other, produce harmonized agenda for WPs and project as a whole. |
11.2 |
1st PStC Mtg |
Month 6
(4 Oct 2005), Kiel-Germany |
Coordinator, Manager, WP leaders, Scientific officer |
Get to know each other and decide on INCOFISH matters. |
11.3 |
2nd PStC Mtg |
Month 13
(15-16 May 2006)
Los Banos, Philippines |
Coordinator, Manager, WP leaders |
Finalization of 1 st annual scientific report, decide on INCOFISH matters. Explore subjects and funding opportunities for “The Return of INCOFISH!”. |
11.4 |
3rd PStC Mtg |
Month 23
(Mar 2007)
La Paz, Mexico |
Coordinator, Manager, WP leaders |
Finalization of 2nd annual scientic report, decide on INCOFISH matters. |
11.5 |
Final PStC Mtg |
Month 34
(Feb 2008) |
Coordinator, Manager, WP leaders |
Finalization of final scientific report, decide on remaining INCOFISH matters. |